This has been a project that has ended up taking longer than expected. But what else is new? I have a friend from work who is an engineer, and he and his engineering buddies were talking about how they seemed to always be multiplying things by pi (you know, π). Anyway, he found that it always takes him about 3 times as long to do a project as he originally thinks it will take him, which I totally relate to. He calls it the "Pi effect," a term which I will now be using.
So we love our house, but we don't love a few things about it - hence the projects. One of those things is the golden oak color of the woodwork. And there is a lot of it in the kitchen. Now this post isn't about how we've painted or stained our cabinets (that's yet to come), but we felt we could do something else to help us like our kitchen a little better. Hardware!
We've always wanted soft close cabinets and drawers. They're just so cool. So after a lot of research, I bought some soft close attachments for the cabinet hinges. These were made specially to attach to the type of hinges we already had, so putting them on only took about 15 minutes. Yay!
This is the hardware attachment
|
This is how they close now
These are the old slides |
On the drawer |
After two weeks, I contacted them again and asked if the correct brackets had gotten shipped (they hadn't, and so they shipped them). So five weeks after originally ordering, I had everything I needed. I took that week to install them (it took me about 20-30 min per drawer to install), and then realized one of the slides was broken. Back online. At this point I'm sure the support person is sick of me. She sends me a new slide, and now I finally have them all done!
The installation process can take a while when you're retrofitting older cabinets - especially when you're trying to make sure they stay level. |
The brackets I needed to attach the slides to the back of the cabinets |
Broken slide
But now they're all done, and they look great!